Home > News > What rules should be followed during the Drilling process 2?

What rules should be followed during the Drilling process 2?


2022-05-28


2. Understand the machinery
(1) Before operating the machine. Read the water well drilling rig operation manual and construction safety manual first.
(2) Be able to operate all equipment on the machine: understand the functions of all control systems, instruments and indicators; understand the rated torque, rated pressure, main winch lifting capacity, maximum drilling diameter, maximum drilling depth and operating space height; Living in rain, snow, ice, gravel and soft soil will change the working ability of the machine.
(3) Read and understand the manufacturer’s operating instructions before preparing to start the machine. If the water well drilling rig is equipped with a special construction method work device, please read the operation manual and construction safety manual of the construction method work device provided by the manufacturer before use.
(2) Understand job protection and labor protection
(1) Wear work clothes necessary for the construction work environment and be equipped with safety equipment.
(2) Wear the safety equipment required by laws and regulations, as well as safety production management departments and employers, and remember to do a good job of protection to avoid unnecessary dangers.
(3) Wear a safety helmet at any time on the job site (including when thinking about problems) and abide by the safety regulations.
(4) Understand the ways and time of assistance, and master how to use first aid kits and fire extinguishers or fire extinguisher systems.
(5) Carefully study safety production management training courses, and strictly prohibit untrained personnel from operating drilling machinery.

(6) Operation errors are caused by many factors, such as carelessness, fatigue, overload, distraction, etc. Operators must never take narcotic drugs or alcohol. Mechanical damage can be repaired in a short period of time, but personal injuries are caused. The damage is long-lasting.
(7) In order to operate the water well drilling rig safely, the operator must actually operate the water well drilling rig and understand the safety regulations, and pass the assessment.
(8) Most machinery suppliers have instructions on equipment operation and maintenance. Before entering a new construction site and starting work, ask the relevant leader or safety coordinator which rules should be followed, and check the water well drilling rig with them, stay vigilant and avoid accidents.
(3) Understand the working performance status of the equipment
Before starting work, check the machinery to make all systems in good operating condition. Correct all omissions and errors before operating the machine. To learn more about the performance status of the equipment, be sure to follow the correct procedures for equipment inspection.
(1) Check whether all threaded connections are tightened, whether bolts and pins are firm and in proper positions.
(2) Check whether the hydraulic oil and fuel lines are leaking.
(3) Check whether the oil level of hydraulic oil, fuel, power head box and each reducer is at the required position.
(4) Check the degree of wear and damage of all wire ropes.
(5) Check the degree of wear and damage of the drill rod.
(6) Check the degree of wear and damage of the drilling tool.
(7) Check whether there are broken or damaged pins or track shoes on the track.
(8) Check whether each safety function is valid.
(4) Safety inspection before equipment operation
(1) Remove all obstacles on the running channel of the water well drilling rig.
(2) To understand dangerous sites such as cable trenches, backfill soil, and other complex terrain.
(3) Fix the doors and windows in the open or closed position.
(4) Confirm that the horn and all alarm devices on the drilling rig are working normally.
(5) Before moving the drilling rig, check the position of the walking device.

Copyright © ZHENGZHOU UNIQUE INDUSTRIAL EQUIPMENT CO., LTD